Project Number Project Title Client Project Phases (Refer to Legend) Location Description Year Completed
1086 BOF - LMF Project Management ArcelorMittal I,II Indiana Provide Project Management Support to the steel mill for projects related to the Reactor and Caster facilities projects. on going
1085 Chlorine PSSR and PSM activities support ArcelorMittal I,II Indiana Chlorine Piping and Standardization Upgrades. Process Safety Management to standardize nine chlorine site facilities as well as locations for safety equipment and functioning. Installation review, operations analysis. Chlorine Gas used: chlorinators, eductors, tubing, CPVC pipe, strainers, process water on going
1084 BOF Gas Cleaning Classifier Lifting Beam Improvements ArcelorMittal I,II,III Indiana Provide Structural Engineering analysis to plant utilities for hood cooling screens and classifier building lifting beam. Provided engineering calculations,  documentation per OSHA requirements. Provided upgrade improvements for stiffnining of existing lifting beam assembly. Reviewed classifier screw lifting and handling mechanics and logistics. Provided concepts for improvements for alternate lifting beam and carriage assemblies. Provided structural engineering calculations and design documents towards the implementation of new improvements which included: structural plans and details, piece mark assemblies, logistics and material handling plan and notes for removal using new improvements. on going
1083 80" HSM Clarifier Improvements ArcelorMittal I,II Indiana Provide Engineering Analysis to plant utilities for improvements towards water clarifiying equipment and processes. Data analysis, system sampling to understand associated problems. Market and vendor research for comparisons of equipment operations. Maintenance concerns and recommendations for stream lining the system. Inlet and drain piping modifications to reduce clogging. 2014
1082 Chlorine PSM Compliance Audit ArcelorMittal I,II Indiana Chlorine PSM Compliance audit. Review and update of the costumers PSM program, questionaire and operating procedures. 2014
1071-03 Hot Stip Mill - Motor Room and basement Cooling - Engineering Study ArcelorMittal I,II Indiana Provide engineering support for the improvements towards a motor room and basement cooling. Areas included: fan upgrades; additional ventilation, filters, balancing and pressurization  on going
1071-2 Hot Stip Mill - West Ventilation House Upgrade ArcelorMittal I,III,IV Indiana West Ventilation House Upgrade. Ventilation design, blowers, ccoling coils, filters, mono rail, access doors, foundation, piping and instrumentation. Engineering design and commissioning.. 2014
1071-1 Hot Stip Mill - East Ventilation House Upgrade ArcelorMittal I,III,IV Indiana East Ventilation House Upgrade. Ventilation design, blowers, ccoling coils, filters, mono rail, access doors, foundation, piping and instrumentation. Engineering design and commissioning.. 2014
1071 Hot Stip Mill - Motor Room Cooling - Engineering Study ArcelorMittal I,II Indiana Provide engineering support for the improvements towards a motor room Cooling System. Areas included: fan upgrades; filters, monitoring, cooling coils, adjustments, and maintenance. 2013
1070 Repair Roads and Site Access Veterans Affairs III,IV,VI Kentucky Provide engineering support for the improvements towards Site access and parking lot repairs, grading, sewers, Electrical site lighting, wayfinding signs on going
1070 Chlorine PSM Compliance Audit ArcelorMittal I, II Indiana Chlorine PSM Compliance audit. Review and update of the costumers PSM program, questionaire and operating procedures. 2014
1069 Chlorine System Localized Warning Systems ArcelorMittal I,III,IV Indiana Chlorine Monitoring - Localized Warning Systems. Review, make recommendations and equipment selection for the customers chlorine gas hazard monitoring system. To include additional monitoring devices, standarization of lights and horns and inner-plant traffic warning signs   on going
1068 Chlorine Piping Modificaitons and Safety Upgrades  ArcelorMittal I,III,IV Indiana Chlorine Piping and Standardization Upgrades. Process Safety Management to standardize nine chlorine site facilities as well as locations for safety equipment and functioning. Installation review, operations analysis. Chlorine Gas used: chlorinators, eductors, tubing, CPVC pipe, strainers, process water 2014
1062 Basement SPS Renovations Veterans Affairs I,III,IV Indiana SPS Renovations. Provide Mechanical, Electrical and Plumbing support to the design of a renovation of Supply Process and Sterilization Spaces in a 10 story hospital Building 1. HVAC, Heating Hot Water system, Domestic Cold Water, Plumbing, Sanitary Sewer, IT and Electrical on going
1061 BOF Hood Cooling Engineering, Pump upgrade, monitoring and system diagnostics Engineering and Equipment Design ArcelorMittal I,III,IV,V Indiana Provide engineering and survey support for the improvements towards a BOF Hood Cooling System. Areas included: monitoring, pressure, temperature, flow measurements; Pump upgrades; Heat Exchanger fan upgrades, adjustments, and maintenance. 2013
1060 VERC and PACT Renovation, 1st Fort Wayne VAMC Hospital, Fort Wayne Veterans Affairs I, II, III, IV, V Indiana Mechanical, Electrical and Plumbing design of approximate 10,000 sq ft VERC and PACT . HVAC, Heating Hot Water system, Domestic Cold Water, mixing stations, Plumbing, Sanitary Sewer, Medical Gases, Fire Protection, IT and Electrical, HVAC and Air Handling Equipment. Overall building energy conservation and efficeincy.  Ergonomics included design of  comfortable working access and posture for a wide range of healthcare workers. Hygiene including "hands-free" operation of sinks and toilets 2015
1058 Chlorine Monitoring, Commissioning and continue ssafety support services ArcelorMittal III,IV Indiana Review, make recommendations and equipment selection for the customer's site chlorine gas hazard related systems. To include additional monitoring devices , public notifications, advance warning system,  standarization of warning lights and horns, update of P and IDs 2013
1057 BOF - LMF Project Management ArcelorMittal I,III,IV,V Indiana Provide Project Management Support to the steel mill for projects related to the Reactor and Caster facilities projects. 2013
1056-02 LMF Engineering, basin pumping additional capacity Engineering and Equipment Design ArcelorMittal I, II, IV,V Indiana LMF Hot Well water system addtiional pump capacity, engineering design 2012
1056-01 LMF - WTP Engineering, Overflow and backwash Basing, East Chicago ArcelorMittal I, II, IV,V Indiana Engineering design to increase water treatment plant facility backwash basin capacity and provide additional overflow capacity in the case of emergency and maintenance.  2012
1053 LMF - WTP Engineering study of operational constraints  ArcelorMittal I, II, IV,V Indiana Engineering study to review existing operating constraints on LMF and water treatment plant facility due to new polluntant discharge elimination system (NPDES). Evaluate the need for additional capacity from backwash basin and route additional piping to NPDES. 2012
1052 DOT-FHWA Department of Transporation II, V Indiana Design and Production of 10 informational modules to the LPAs for highway laws, construction, and state specific requirements. 2012
1051 Clinical Improvements, 1st, 3rd and 4th floor at Richard L Roudebush VAMC Hospital, Indianapolis Veterans Affairs I, II, III, IV, V Indiana Provide Mechanical, Electrical and Plumbing support to the design of a 10,000 sq ft Clinical Spaces in a 10 story hospital Building 1. HVAC, Heating Hot Water system, Domestic Cold Water, mixing stations, Plumbing, Sanitary Sewer, Medical GasesFire Protection, IT and Electrical, HVAC and Air Handling Equipment. Protect and preserve other floors of the hospital that may be affected by work done..   2014
1050 BOF Caster Dryer Engineering Study ArcelorMittal I,II Indiana Provide engineering analysis for the replacement of an existing compressed air dryer. Data analysis, system testing to determine required capacities. Vendor research and comparison of existing equipment. Maintenance concerns and spare parts of current vendors being utilized by customer. Review of space requirements, new equipment envelope size and space constraints of location. Participated in vendor/customer meetings and made recommendations for purchase of equipment.    2014
1049 BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System upgrade including fan, VFD, piping and controls Engineering and Equipment Design ArcelorMittal I,III,IV,V Indiana Fall Protection: Accessibility platforms, non-slip gratings, safety toe-plates, handrails  Electrical: temrminations, ANSI enclosures, and  explosion proof ratings 2010
1047 BOF - Caster Project Management ArcelorMittal I,III,IV,V Indiana Ergonomics: Assessment and implenetation design of manual-trolley around hazardous molten steel in limited confined space.  Bending and turning stresses, load distribution to permit low center of gravity and prevention of flipping hazard. 2012
1046 Chlorine Monitoring ArcelorMittal III,IV Indiana Review, make recommendations and equipment selection for the customers chlorine gas hazard monitoring system. To include additional monitoring devices and communication to a central notification system and the utilties dispatch and fire department dispatch center. 2011
1044 BOF - Caster Project Management ArcelorMittal I, II, III Indiana Provide ongoing Project Management Support to the steel mill for projects related to the BOF and Caster facilities projects. 2012
1043 Chlorine PHA ArcelorMittal I, II, III Indiana Process Hazard Analysis, risk analysis.  General chlorine use and risks and nine chlorine site facilities on installation review, , operations analysis, as well as locations for safety equipment and functioning equipment used to handle the chlorine    2011
1042 Chlorine P and I D ArcelorMittal I, II, III Indiana Process Safety Management to update and generate nine chlorine site facility process and instrumentation schematics as well as locations for safety equipment and functioning. Installation review, operations analysis. Liquid Chlorine used: evaporators, chlorinators, eductors, process water, solution water. Chlorine Gas used: chlorinators, eductors, process water, solution water   2011
1041 Chlorine PSM Compliance Audit ArcelorMittal I, II, III Indiana Review and update of the costumers PSM program, questionaire and operating procedures. 2011
1040 BOF - Caster Project Management ArcelorMittal I, II, III Indiana Provide Project Management Support to the steel mill for projects related to the BOF and Caster facilities projects. 2011
1037 Building 6 Renovation at Aleda E Lutz VAMC Saginaw, Michigan Veterans Affairs I, II, III Michigan Provide Mechanical, Electrical and Plumbing support to renovate Building 6 currently used as a boiler facility to a 2 story office building for engineering. Plumbing, Sanitary Sewer, IT, Electrical, HVAC and Air Handling Equipment.  2012
1035 GI 8 East Upgrade at Richard L Roudebush VAMC Hospital, Indianapolis Veterans Affairs I, II, III,IV Indiana Provide Mechanical, Electrical and Plumbing support for a GI relocation and upgrade from 4rth floor to 8th floor in Building 1. HVAC, Heating Hot Water system, Domestic Cold Water, mixing stations, Plumbing, Sanitary Sewer, Medical GasesFire Protection, IT and Electrical, HVAC and Air Handling Equipment. Protect and preserve other floors of the hospital that may be affected by work done. 2012
1034 Consolidate Scope Sterilization at Richard L Roudebush VAMC Hospital, Indianapolis Veterans Affairs I, II, III Indiana Consolidate Scope Sterilization at the Richard L Roudebush VAMC. Included potable hot water and cold water.  Objective was to renovate the existing space of the SPD area in the basement to allow for increased capacity of scope cleaning and sterilization; relocate all other locations currently utilized for scope cleaning and sterilization to the renovated SPD area in the basement. Include new equipment, ductwork, piping and appurtenances 2009
1033 Emergency Department addition to building 58 Veterans Affairs I, II, III Illinois Provide Mechanical, Electrical, Structural and Plumbing support for a ED addition to building 58. Medical Gases, Plumbing, Sanitary Sewer, Fire Protection, HVAC and Air Handling Equipment, Structural foundations, floors, roof and walls. Landscaping and parking rerouting. Included potable hot water and cold water.   NA
1032 Storm Sewer Drainage System for BOF at Steel Mill  ArcelorMittal I, II, III Indiana Provide Design Concept drawings to include sewer manholes, drain piping and perforated french drain piping to take care of constant flooding issues between the BOF and Caster facilities. 2009
1031 Structural Evaluation and Analysis Building 103 Veterans Affairs I, II Illinois Provide evaluation and analysis of the structural integrity and make recommendations in the form of a report to the VA for Building 103, Nursing Unit No. 4 Mechanical Room which was damaged when the electrical transformer outside the south end of the building caught fire. Inspection included roofing and insulation, wall and roof framing and review of the structural drawings 2009
Energy FAA Energy Audit for FAA facilities - Southern Region Federal Aviation Administration I, II, VI Florida, Georgia, North Carolina, Tennessee Provide Analysis on FAA facilities for energy reduction and conservation. Recommend Energy Conservation Measures related to light occupancy changes, operation of chillers, Air Handling Unit modifications, Pump modifications. Cooling tower operations. Included potable water,, cooling water supply and recirculation and cascading use. Renewable energy systems and roof-mounted PV cell concept design.  2009
ABE-01 Columbarium Expansion - Abraham Lincoln National Cemetery Veterans Affairs III Illinois Provide Columbarium Plaza to hold 3600 Niches, to include grading, landscaping, storm sewers, sidewalk parking and roadway, water supply, tank and irrigation zone control with spray nozzles.  2009
1030 Electrical Upgrade - Buildings 58, 98, 104 Veterans Affairs I, II, III Illinois Electrical upgrade to expand transformers/ switchgears. Install new transformers outside of rooms (58 and 104) on concrete pads while current equipment inside rooms are being used. Switch over to new transformers after installed and remove current transformers, utilizing the space for additional equipment.  Provide additional ventilation for Building 98 transformer room to current supply ductwork by means of fan, coils, reworking of supply intake outside of pipe chase area.  2013
997-05 BOF Alloy Conveyor Storage Building - Concept ArcelorMittal I Indiana New alloy conveying system for BOF. New storage building for alloy system 2012
1031 PHA Analysis Sessions for Co-Generation Plant under construction  ArcelorMittal I Illinois Hazard Analysis, risk analysis, Energy usage review and reduction,  new Power Plant facility design process and piping review,. Included water suply and condensate systems 2009
981 Process Safety Management  - Propane System Coordinator ArcelorMittal I, II, V, VI Indiana Maintenance report keeping, equipment changeovers, HAZOP Training,  2013
990-05 BOF Stack Replacement and Upgrade - Engineering detail design ArcelorMittal III Indiana New stack shell design, access platforms, ladders, Gas flow measurements, electrical and lighting, Concrete reinforcement design around base of stack 2009
USGS DOI- US Geological Survey - LMERS - National Park Service Department of the Interior - National Park Service II, V Indiana The feasibility study for the conversion of a Visitor Center to a Claas III Lab required assessment of  existing building structure, layout, access issues, utilities and outlying structures. New utilities concept design included water and wastewater systems. 2011
1022 Security Upgrade - Outpatient Pharmacy and Agent Cashier Veterans Affairs I,II,III Illinois Upgrade security systems and additional features to include cameras, windows, reflected ceiling relocating and wall relocation 2008
1021 SPD Suite - HVAC and Pure Water System Upgrade ArcelorMittal I,II,III,IV Illinois Water supply and purificaation system based on RO and for SPD washing requirements. Air borne Contamination Control:  Upgrade of HVAC, Operational objectives with Energy cost sensitive approach 2008
1020 New Storage Building with multiple truck bays including electricity, lighting and heating. New Soil Pit design to replace for ground maintenance soil storage at Cemeteries (Design-Build) Veterans Affairs I,II,III,IV,VI Kentucky Site layout, Potable water supply and heating, sewers, foundations, block framing, overhead doors, Electrical, fire hydrant, roof, Fire Detection for a small warehouse / storage Building, 2007
997 BOF Alloy Feed Conveying System - Engineering Study Design. Bin sizing, equipment specifications and Request for Proposal ArcelorMittal I,II,III Indiana Site Utilities, Equipment Layout, Furnace chutes, structural floor layout, electrical, controls, weigh belt feeders, alloy feed receipt 2008
GAF-02 GAF Materials - Engineering Construction Management ArcelorMittal III,IV Indiana construction management services, installation and design recommendations 2007
1014 Fuel Loading Station - Engineering Services (Detailed Design ArcelorMittal I,II,III Indiana Demolition existing truck fueling station, fuel piping, new loading ramp, new weather shelter, electrical, lighting 2007
1023 PHA Analysis Sessions for Co-Generation Plant,  ArcelorMittal I,II,VI Illinois Hazard Analysis, risk analysis, Energy usage review and reduction,  new Power Plant facility design process and piping review,  2007
1017 Engineering Services to provide ETRAINING for operators and maintenance personnel at LMF Water Treatment Plant  ArcelorMittal I,II,V,VI Indiana Cooling towers, pumps, chemical additives, LMF operations, maintenance, backwash basins, Water Scrubbers, Cooling Water Systems, Water Sprays 2007
1016 BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System upgrade including fan, VFD, piping and controls Study and Equipment Recommendations ArcelorMittal I,II Indiana Hood Cooling water system monitoring, heat exchanger fans, Air humidity and speed recording, BOF Furnace consumption 2007
1015 Engineering Services for Natural Gas Mixing Station to supply in the case of an emergency to Coke Oven Gas Main Pipe Line - Design and installation ArcelorMittal I,II,III Indiana Mixing station building, ventilation, Natural Gas, Coke Oven Gas, steam tracing relocation, condensate relocation 2007
1013 Engineering Study and Equipment Recommendations for Pickle Line Strip Surface Inspection System ArcelorMittal I,II,III Indiana Pickle Line existing utilities field and drawing surveys, piping modifications, equipment modifications new equipment installation 2006
1012 Engineering Study and Recommendation for Pickle Line Fume Exhaust System Upgrade and Replacement - Environmental Controls ArcelorMittal I,II,III Indiana Pickle Line existing utilities field and drawing surveys, piping modifications, equipment installation, demolition, Water supply and recirculation systems 2006
996 Air Compressor Upgrade Engineering Study, Design and Installation ArcelorMittal III,IV,V,VI Indiana Site Utilities, Water , natural gas, sewers, foundation pad, electrical, demolition, Air Reservoir tanks, piping, silencer 2006
GAF-01 GAF piping and valve stations replacement and upgrade - Engineering study and piping installation design  ArcelorMittal I,II,III Indiana piping design, new pump installation, pipe supports, steam piping, condensate piping, liquid asphalt piping 2006
991-01 New Storage Building with multiple truck bays including a washbay, site utilities, natural gas, electricity, water, sanitary and storm sewers         ( Design-Build) Veterans Affairs I,II,III,IV Illinois Surveying, geotechnical investigations,Site Utilities, Water,natural gas, sewers, foundation, framing, brick exteriors, insulated,  Electrical, Lighting, HVAC, roof, Fire Detection. Included potable hot water and cold water for a warehouse / storage building. Water and waste water system design. 2006
990-01 Electrical Upgrade, NEC Violations, 5 hospital buildings and complex, 200,000 sq ft area Veterans Affairs I,II,III,IV Illinois Electrical conduit overfill, new panel, conduits, clearances, tap violations 2006
990-01-02 BOF Stack Replacement and Upgrade - Study design ArcelorMittal I,II Indiana Foundation and structural assessments, current gas flume assessment, new stack reinforcement design, access platforms, ladders and stairs, Gas flow measurements 2006
989-01 BP Propylene Facility - Engineering Services ArcelorMittal I,II Indiana Tank - decompression and cleaning 2006
992 BOP PHA Gas Cleaning Engineering Study ArcelorMittal I,II,VI Indiana Duct layout, Furnaces, Water sprays, Heat analysis, Safety concerns, Maintenance recommendations 2006
976 Gas Cleaning System review for damper operations and furnace control for two-furnace operations for increased productivity ArcelorMittal I,II,VI Indiana Scrubber, Venturi, Waste Water Treatment,Electrical, HVAC, CO Detection and Suppression, 2006
966-2 Two(2) 39,000 cfm Fume Exhaust Systems for Process Line, including scrubber & fan specifications, hood & ductwork designs - Detailed Design ArcelorMittal I,II,III,IV,V Indiana Equipment Layout, Hood & Duct Design, Lifting Mechanism & Building Designs, Electrical, HVAC, Fire Detection, Fire Suppression 2005
963-01 Etraining System for Process Heater and Gas Cleaning Systems at a Sinter Plant, modules ArcelorMittal I,V,VI Indiana Process Review, Site Walkdown, Module Development 2005
960-04 2500 GPM Emergency Water System for an industrial plant, including tie-in into existing water supply, pumping & recirculation piping, pump controls & fuel oil tank conversion to water service - Detailed Design ArcelorMittal I,II,III,IV,V Indiana Emergency Water supply assessment, design of emergency system including, tank, piping  2005
984-01 Cross Country Oil Line system, 4000 ft, steam heated ArcelorMittal I,II,III,IV Indiana Flexibility, loops, control system, multiple users 2005
977-02A New Boilerhouse Desuperheated Water Generation,  including reverse osmosis skids, 1st Pass 1000 gpm, 2nd pass 100 gpm,  tank, & transfer pumps, deaerator with controls & interconnecting piping - Detailed Design ArcelorMittal I,II,III,IV,V Indiana Potable water supply, High purity water supply with a second pass RO unit. Foundations, Space Utilization, Control Scheme, Piping Installation, Electrical 2005
976-02 Engineering Services for new electrically driven, 15 HP pumps with platform & piping for a chemical loadout station - Detailed Design ArcelorMittal I,II,III,IV Illinois Structural Design, Pump Location, Light Oil Piping Design, Electrical 2005
975A Pre Carbon Facility - Fuel Change over - COG Distribution Analysis, Suitability Review and Facility Definition for six(6) 60 MM BTU/HR Coke Oven Gas Trains. ArcelorMittal I, II,VI Indiana Coke Oven Gas Piping, Tie-In Locations, Energy Savings Evaluation, Electrical, HVAC, roof, Fire Detection, Fire Suppression 2005
978 New Boilerhouse Utility Piping, Four(4) 150,000 lb/hr of Steam at 900 psig including coke oven gas, natural gas, instrument air (IA), nitrogen (N2), potable water & service water with supports & tie-in locations - Detailed Design ArcelorMittal I,II,III Indiana Design of utilities including potable water system. 2005
976 Commissioning Services for a Light Oil Loadout Station Upgrade, including new operator panel, flowmeter & vapor recovery system ArcelorMittal IV,V Illinois Checklist Development, Operator Training, Troubleshooting, Electrical, HVAC, Fire Detection, Fire Suppression 2005
975 Engineering study that surveyed and identified savings in  complex of  400,000 lb/hr of steam system with 10,000 ft of steam piping. ArcelorMittal I,II,VI Indiana Site Investigation, Survey Documentation, Report Development 2005
966-1 Two (2) 39,000 cfm Fume Exhaust System for Electr Tinning Lines, including scrubber & fan specifications, hood & ductwork designs - Conceptual Design Study ArcelorMittal I,II,III Indiana Equipment Location Scenarios, Utility Tie-In Determination, Duct Routing Selection, Electrical, HVAC, Fire Detection, Fire Suppression 2004
965-1 & 965-2 Etraining system for Hot Strip Mill Operations & Maintenance ArcelorMittal V Indiana Module Development, Process Review,  2004
960-02 Engineering Study and evaluation of a 100,000 gpm Plant Water System, including taking and analyzing flow measurements ArcelorMittal I,II Indiana Plant Water System Walkdown, Flow Measurements, Piping Replacement 2004
959-2 New Air Compressor Facility for a Pickling Line, including 2 x 2000 cfm compressor station layout,  selection, control scheme development and piping layout - Detailed Design ArcelorMittal III,IV Indiana Cooling water system design including strainers 2004
959-1 Engineering Study for new air compressor facility at a Pickling Line, including site walkdowns, drawing research and flow measurements ArcelorMittal I,II Indiana Compressor Selection, Equipment Location Scenarios, System Evaluation 2004
960 Engineering Study and evaluation of a 110,000 GPM Cooling Water System, including system replacement scenarios  & Emergency Pumping System ArcelorMittal I,II Indiana Emergency Water supply assessment, design of emergency system including, tank, piping  2004
QBOP-1 Training System update for a Q-Bop Propane System, OSHA required ArcelorMittal V Indiana Module Update 2004
970-01 Process Safety Management & Training Services for a chemical loadout station upgrade ArcelorMittal V Illinois Training Manual Development, PSM Plan Modification 2004
956-2 Chemical Loadout Station Vapor Recovery Upgrade, including vapor recovery, plc controls, utility piping & loadout platform - Detailed Design ArcelorMittal III Illinois Valve Station Design, Pipe Routing, Structural Platform Design 2004
972 Feasibility Study for a heating station roof conversion from an open loop cooling system to a closed loop cooling, 100 MM BTU/hr system ArcelorMittal I,II Indiana Envelope Determination, Existing Utility Evaluation, Calculations, Electrical, HVAC, roof, Fire Suppression 2004
948 Computer Based Training for 2000 scfm Fume Exhaust System Upgrade at a Chrome Plating Facility ArcelorMittal V Indiana Graphic Design, Module Development, Classroom Training 2003
947 Galv Line Compressed Air Knife Study ArcelorMittal I,II Indiana Process Evaluation, Piping Modifications 2003
956-1 Conceptual Study for a Chemical Loadout Station Vapor Recovery Upgrade, including location selection, tie-ins for new utilities and Control Panel Location ArcelorMittal I,II Illinois Location Options, Utiility Tie-Ins, Electrical 2003
927A Oxygen System Upgrade for a Building Including new oxygen control stations, piping, alarms & controls - Detailed Design Veterans Affairs I,II,III,IV Illinois Alarms, Power & Control Wiring, Oxygen Piping, Site Preparation, Electrical, HVAC, Fire Detection 2003
953 Engineering Study of Hood Cooling Water system for a two (2) molten 285 Ton Furnaces ArcelorMittal I,II Indiana Data Gathering & Evaluation, Report Development 2003
952 PSM Administration for a propane system at Q-BOP ArcelorMittal I,II,V Indiana Classroom Training Sessions, Audit Performance 2003
950 Drawing Revisions for power generation facility ArcelorMittal III Illinois Electronic Document Management, CAD Work 2003
946 Chrome Plating Facility 2000 cfm Fume Exhaust Upgrade, including, ductwork design, plating solution evaporation system & storage tank design - Detailed Design ArcelorMittal I,II,III Indiana Tank Design, Pipe Mat'l Selection, Equipment Selection, Platform Design, HVAC, Electrical 2003
945 Gas Cleaning Stack Performance improvement, review and recommendations for the gas cleaning system ArcelorMittal I,II Pennsylvania Process Review, Report Development 2003
927-1,2 Chrome Line Plating Solution Temperature Control for improvement in yield and quality ArcelorMittal I,II,III Indiana Piping Design,Equipment Selection, Process Calculations 2002
922-3 Computer Based Mechanical & Electrical Training Programs for Air Compressor Facility Operation & Maintenance ArcelorMittal V Indiana Training Program Development 2002
922-2 Compressor Facility, Including Compressors (2000 cfm x 4), Dryer, Receivers (2 x 15,000 gal.), Piping Modifications & Control Systems - Detailed Design ArcelorMittal III,IV Indiana Compressors, Dryers, Receivers, Location Selection, Piping, Electrical, HVAC, Fire Suppression 2002
944 As-Built Drawing Documentation for a power generation facility ArcelorMittal III Illinois CAD Work, Drawing Management 2002