EnerTronics Engineering Corp |
|
Project
List |
|
Period:
2002-2015 |
|
Project
Number |
Project
Title |
Client |
Project
Phases (Refer to Legend) |
Location |
Description |
Year
Completed |
|
1086 |
BOF - LMF Project Management |
ArcelorMittal |
I,II |
Indiana |
Provide Project Management Support to the steel mill for
projects related to the Reactor and Caster facilities projects. |
on going |
|
1085 |
Chlorine PSSR and PSM activities support |
ArcelorMittal |
I,II |
Indiana |
Chlorine Piping and Standardization Upgrades. Process Safety
Management to standardize nine chlorine site facilities as well as locations
for safety equipment and functioning. Installation review, operations
analysis. Chlorine Gas used: chlorinators, eductors, tubing, CPVC pipe,
strainers, process water |
on going |
|
1084 |
BOF Gas Cleaning Classifier Lifting Beam Improvements |
ArcelorMittal |
I,II,III |
Indiana |
Provide Structural Engineering analysis to plant utilities for
hood cooling screens and classifier building lifting beam. Provided
engineering calculations,
documentation per OSHA requirements. Provided upgrade improvements for
stiffnining of existing lifting beam assembly. Reviewed classifier screw
lifting and handling mechanics and logistics. Provided concepts for
improvements for alternate lifting beam and carriage assemblies. Provided
structural engineering calculations and design documents towards the
implementation of new improvements which included: structural plans and
details, piece mark assemblies, logistics and material handling plan and
notes for removal using new improvements. |
on going |
|
1083 |
80" HSM Clarifier Improvements |
ArcelorMittal |
I,II |
Indiana |
Provide Engineering Analysis to plant utilities for improvements
towards water clarifiying equipment and processes. Data analysis, system
sampling to understand associated problems. Market and vendor research for
comparisons of equipment operations. Maintenance concerns and recommendations
for stream lining the system. Inlet and drain piping modifications to reduce
clogging. |
2014 |
|
1082 |
Chlorine PSM Compliance Audit |
ArcelorMittal |
I,II |
Indiana |
Chlorine PSM Compliance audit. Review and update of the
costumers PSM program, questionaire and operating procedures. |
2014 |
|
1071-03 |
Hot Stip Mill - Motor Room and basement Cooling - Engineering
Study |
ArcelorMittal |
I,II |
Indiana |
Provide engineering support for the improvements towards a motor
room and basement cooling. Areas included: fan upgrades; additional
ventilation, filters, balancing and pressurization |
on going |
|
1071-2 |
Hot Stip Mill - West Ventilation House Upgrade |
ArcelorMittal |
I,III,IV |
Indiana |
West Ventilation House Upgrade. Ventilation design, blowers,
ccoling coils, filters, mono rail, access doors, foundation, piping and
instrumentation. Engineering design and commissioning.. |
2014 |
|
1071-1 |
Hot Stip Mill - East Ventilation House Upgrade |
ArcelorMittal |
I,III,IV |
Indiana |
East Ventilation House Upgrade. Ventilation design, blowers,
ccoling coils, filters, mono rail, access doors, foundation, piping and
instrumentation. Engineering design and commissioning.. |
2014 |
|
1071 |
Hot Stip Mill - Motor Room Cooling - Engineering Study |
ArcelorMittal |
I,II |
Indiana |
Provide engineering support for the improvements towards a motor
room Cooling System. Areas included: fan upgrades; filters, monitoring,
cooling coils, adjustments, and maintenance. |
2013 |
|
1070 |
Repair Roads and Site Access |
Veterans Affairs |
III,IV,VI |
Kentucky |
Provide engineering support for the improvements towards Site
access and parking lot repairs, grading, sewers, Electrical site lighting,
wayfinding signs |
on going |
|
1070 |
Chlorine PSM Compliance Audit |
ArcelorMittal |
I, II |
Indiana |
Chlorine PSM Compliance audit. Review and update of the
costumers PSM program, questionaire and operating procedures. |
2014 |
|
1069 |
Chlorine System Localized Warning Systems |
ArcelorMittal |
I,III,IV |
Indiana |
Chlorine Monitoring - Localized Warning Systems. Review, make
recommendations and equipment selection for the customers chlorine gas hazard
monitoring system. To include additional monitoring devices, standarization
of lights and horns and inner-plant traffic warning signs |
on going |
|
1068 |
Chlorine Piping Modificaitons and Safety Upgrades |
ArcelorMittal |
I,III,IV |
Indiana |
Chlorine Piping and Standardization Upgrades. Process Safety
Management to standardize nine chlorine site facilities as well as locations
for safety equipment and functioning. Installation review, operations
analysis. Chlorine Gas used: chlorinators, eductors, tubing, CPVC pipe,
strainers, process water |
2014 |
|
1062 |
Basement SPS Renovations |
Veterans Affairs |
I,III,IV |
Indiana |
SPS Renovations. Provide Mechanical, Electrical and Plumbing
support to the design of a renovation of Supply Process and Sterilization
Spaces in a 10 story hospital Building 1. HVAC, Heating Hot Water system,
Domestic Cold Water, Plumbing, Sanitary Sewer, IT and Electrical |
on going |
|
1061 |
BOF Hood Cooling Engineering, Pump upgrade, monitoring and
system diagnostics Engineering and Equipment Design |
ArcelorMittal |
I,III,IV,V |
Indiana |
Provide engineering and survey support for the improvements
towards a BOF Hood Cooling System. Areas included: monitoring, pressure,
temperature, flow measurements; Pump upgrades; Heat Exchanger fan upgrades,
adjustments, and maintenance. |
2013 |
|
1060 |
VERC and PACT Renovation, 1st Fort Wayne VAMC Hospital, Fort
Wayne |
Veterans Affairs |
I, II, III, IV, V |
Indiana |
Mechanical, Electrical and Plumbing design of approximate 10,000
sq ft VERC and PACT . HVAC, Heating Hot Water system, Domestic Cold Water,
mixing stations, Plumbing, Sanitary Sewer, Medical Gases, Fire Protection, IT
and Electrical, HVAC and Air Handling Equipment. Overall building energy
conservation and efficeincy.
Ergonomics included design of
comfortable working access and posture for a wide range of healthcare
workers. Hygiene including "hands-free" operation of sinks and
toilets |
2015 |
|
1058 |
Chlorine Monitoring, Commissioning and continue ssafety support
services |
ArcelorMittal |
III,IV |
Indiana |
Review, make recommendations and equipment selection for the
customer's site chlorine gas hazard related systems. To include additional
monitoring devices , public notifications, advance warning system, standarization of warning lights and horns,
update of P and IDs |
2013 |
|
1057 |
BOF - LMF Project Management |
ArcelorMittal |
I,III,IV,V |
Indiana |
Provide Project Management Support to the steel mill for
projects related to the Reactor and Caster facilities projects. |
2013 |
|
1056-02 |
LMF Engineering, basin pumping additional capacity Engineering
and Equipment Design |
ArcelorMittal |
I, II, IV,V |
Indiana |
LMF Hot Well water system addtiional pump capacity, engineering
design |
2012 |
|
1056-01 |
LMF - WTP Engineering, Overflow and backwash Basing, East
Chicago |
ArcelorMittal |
I, II, IV,V |
Indiana |
Engineering design to increase water treatment plant facility
backwash basin capacity and provide additional overflow capacity in the case
of emergency and maintenance. |
2012 |
|
1053 |
LMF - WTP Engineering study of operational constraints |
ArcelorMittal |
I, II, IV,V |
Indiana |
Engineering study to review existing operating constraints on
LMF and water treatment plant facility due to new polluntant discharge
elimination system (NPDES). Evaluate the need for additional capacity from
backwash basin and route additional piping to NPDES. |
2012 |
|
1052 |
DOT-FHWA |
Department of Transporation |
II, V |
Indiana |
Design and Production of 10 informational modules to the LPAs
for highway laws, construction, and state specific requirements. |
2012 |
|
1051 |
Clinical Improvements, 1st, 3rd and 4th floor at Richard L
Roudebush VAMC Hospital, Indianapolis |
Veterans Affairs |
I, II, III, IV, V |
Indiana |
Provide Mechanical, Electrical and Plumbing support to the
design of a 10,000 sq ft Clinical Spaces in a 10 story hospital Building 1.
HVAC, Heating Hot Water system, Domestic Cold Water, mixing stations,
Plumbing, Sanitary Sewer, Medical GasesFire Protection, IT and Electrical,
HVAC and Air Handling Equipment. Protect and preserve other floors of the
hospital that may be affected by work done.. |
2014 |
|
1050 |
BOF Caster Dryer Engineering Study |
ArcelorMittal |
I,II |
Indiana |
Provide engineering analysis for the replacement of an existing
compressed air dryer. Data analysis, system testing to determine required
capacities. Vendor research and comparison of existing equipment. Maintenance
concerns and spare parts of current vendors being utilized by customer.
Review of space requirements, new equipment envelope size and space
constraints of location. Participated in vendor/customer meetings and made
recommendations for purchase of equipment. |
2014 |
|
1049 |
BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System
upgrade including fan, VFD, piping and controls Engineering and Equipment
Design |
ArcelorMittal |
I,III,IV,V |
Indiana |
Fall Protection: Accessibility platforms, non-slip gratings,
safety toe-plates, handrails
Electrical: temrminations, ANSI enclosures, and explosion proof ratings |
2010 |
|
1047 |
BOF - Caster Project Management |
ArcelorMittal |
I,III,IV,V |
Indiana |
Ergonomics: Assessment and implenetation design of
manual-trolley around hazardous molten steel in limited confined space. Bending and turning stresses, load
distribution to permit low center of gravity and prevention of flipping
hazard. |
2012 |
|
1046 |
Chlorine Monitoring |
ArcelorMittal |
III,IV |
Indiana |
Review, make recommendations and equipment selection for the
customers chlorine gas hazard monitoring system. To include additional
monitoring devices and communication to a central notification system and the
utilties dispatch and fire department dispatch center. |
2011 |
|
1044 |
BOF - Caster Project Management |
ArcelorMittal |
I, II, III |
Indiana |
Provide ongoing Project Management Support to the steel mill for
projects related to the BOF and Caster facilities projects. |
2012 |
|
1043 |
Chlorine PHA |
ArcelorMittal |
I, II, III |
Indiana |
Process Hazard Analysis, risk analysis. General chlorine use and risks and nine
chlorine site facilities on installation review, , operations analysis, as
well as locations for safety equipment and functioning equipment used to
handle the chlorine |
2011 |
|
1042 |
Chlorine P and I D |
ArcelorMittal |
I, II, III |
Indiana |
Process Safety Management to update and generate nine chlorine
site facility process and instrumentation schematics as well as locations for
safety equipment and functioning. Installation review, operations analysis.
Liquid Chlorine used: evaporators, chlorinators, eductors, process water,
solution water. Chlorine Gas used: chlorinators, eductors, process water,
solution water |
2011 |
|
1041 |
Chlorine PSM Compliance Audit |
ArcelorMittal |
I, II, III |
Indiana |
Review and update of the costumers PSM program, questionaire and
operating procedures. |
2011 |
|
1040 |
BOF - Caster Project Management |
ArcelorMittal |
I, II, III |
Indiana |
Provide Project Management Support to the steel mill for
projects related to the BOF and Caster facilities projects. |
2011 |
|
1037 |
Building 6 Renovation at Aleda E Lutz VAMC Saginaw, Michigan |
Veterans Affairs |
I, II, III |
Michigan |
Provide Mechanical, Electrical and Plumbing support to renovate
Building 6 currently used as a boiler facility to a 2 story office building
for engineering. Plumbing, Sanitary Sewer, IT, Electrical, HVAC and Air
Handling Equipment. |
2012 |
|
1035 |
GI 8 East Upgrade at Richard L Roudebush VAMC Hospital,
Indianapolis |
Veterans Affairs |
I, II, III,IV |
Indiana |
Provide Mechanical, Electrical and Plumbing support for a GI
relocation and upgrade from 4rth floor to 8th floor in Building 1. HVAC,
Heating Hot Water system, Domestic Cold Water, mixing stations, Plumbing,
Sanitary Sewer, Medical GasesFire Protection, IT and Electrical, HVAC and Air
Handling Equipment. Protect and preserve other floors of the hospital that
may be affected by work done. |
2012 |
|
1034 |
Consolidate Scope Sterilization at Richard L Roudebush VAMC
Hospital, Indianapolis |
Veterans Affairs |
I, II, III |
Indiana |
Consolidate Scope Sterilization at the Richard L Roudebush VAMC.
Included potable hot water and cold water.
Objective was to renovate the existing space of the SPD area in the
basement to allow for increased capacity of scope cleaning and sterilization;
relocate all other locations currently utilized for scope cleaning and
sterilization to the renovated SPD area in the basement. Include new
equipment, ductwork, piping and appurtenances |
2009 |
|
1033 |
Emergency Department addition to building 58 |
Veterans Affairs |
I, II, III |
Illinois |
Provide Mechanical, Electrical, Structural and Plumbing support
for a ED addition to building 58. Medical Gases, Plumbing, Sanitary Sewer,
Fire Protection, HVAC and Air Handling Equipment, Structural foundations,
floors, roof and walls. Landscaping and parking rerouting. Included potable
hot water and cold water. |
NA |
|
1032 |
Storm Sewer Drainage System for BOF at Steel Mill |
ArcelorMittal |
I, II, III |
Indiana |
Provide Design Concept drawings to include sewer manholes, drain
piping and perforated french drain piping to take care of constant flooding
issues between the BOF and Caster facilities. |
2009 |
|
1031 |
Structural Evaluation and Analysis Building 103 |
Veterans Affairs |
I, II |
Illinois |
Provide evaluation and analysis of the structural integrity and
make recommendations in the form of a report to the VA for Building 103,
Nursing Unit No. 4 Mechanical Room which was damaged when the electrical
transformer outside the south end of the building caught fire. Inspection
included roofing and insulation, wall and roof framing and review of the
structural drawings |
2009 |
|
Energy FAA |
Energy Audit for FAA facilities - Southern Region |
Federal Aviation Administration |
I, II, VI |
Florida, Georgia, North Carolina, Tennessee |
Provide Analysis on FAA facilities for energy reduction and
conservation. Recommend Energy Conservation Measures related to light
occupancy changes, operation of chillers, Air Handling Unit modifications,
Pump modifications. Cooling tower operations. Included potable water,,
cooling water supply and recirculation and cascading use. Renewable energy
systems and roof-mounted PV cell concept design. |
2009 |
|
ABE-01 |
Columbarium Expansion - Abraham Lincoln National Cemetery |
Veterans Affairs |
III |
Illinois |
Provide Columbarium Plaza to hold 3600 Niches, to include
grading, landscaping, storm sewers, sidewalk parking and roadway, water
supply, tank and irrigation zone control with spray nozzles. |
2009 |
|
1030 |
Electrical Upgrade - Buildings 58, 98, 104 |
Veterans Affairs |
I, II, III |
Illinois |
Electrical upgrade to expand transformers/ switchgears. Install
new transformers outside of rooms (58 and 104) on concrete pads while current
equipment inside rooms are being used. Switch over to new transformers after
installed and remove current transformers, utilizing the space for additional
equipment. Provide additional
ventilation for Building 98 transformer room to current supply ductwork by
means of fan, coils, reworking of supply intake outside of pipe chase
area. |
2013 |
|
997-05 |
BOF Alloy Conveyor Storage Building - Concept |
ArcelorMittal |
I |
Indiana |
New alloy conveying system for BOF. New storage building for
alloy system |
2012 |
|
1031 |
PHA Analysis Sessions for Co-Generation Plant under
construction |
ArcelorMittal |
I |
Illinois |
Hazard Analysis, risk analysis, Energy usage review and
reduction, new Power Plant facility
design process and piping review,. Included water suply and condensate
systems |
2009 |
|
981 |
Process Safety Management
- Propane System Coordinator |
ArcelorMittal |
I, II, V, VI |
Indiana |
Maintenance report keeping, equipment changeovers, HAZOP
Training, |
2013 |
|
990-05 |
BOF Stack Replacement and Upgrade - Engineering detail design |
ArcelorMittal |
III |
Indiana |
New stack shell design, access platforms, ladders, Gas flow
measurements, electrical and lighting, Concrete reinforcement design around
base of stack |
2009 |
|
USGS |
DOI- US Geological Survey - LMERS - National Park Service |
Department of the Interior - National Park Service |
II, V |
Indiana |
The feasibility study for the conversion of a Visitor Center to
a Claas III Lab required assessment of
existing building structure, layout, access issues, utilities and
outlying structures. New utilities concept design included water and
wastewater systems. |
2011 |
|
1022 |
Security Upgrade - Outpatient Pharmacy and Agent Cashier |
Veterans Affairs |
I,II,III |
Illinois |
Upgrade security systems and additional features to include
cameras, windows, reflected ceiling relocating and wall relocation |
2008 |
|
1021 |
SPD Suite - HVAC and Pure Water System Upgrade |
ArcelorMittal |
I,II,III,IV |
Illinois |
Water supply and purificaation system based on RO and for SPD
washing requirements. Air borne Contamination Control: Upgrade of HVAC, Operational objectives
with Energy cost sensitive approach |
2008 |
|
1020 |
New Storage Building with multiple truck bays including
electricity, lighting and heating. New Soil Pit design to replace for ground
maintenance soil storage at Cemeteries (Design-Build) |
Veterans Affairs |
I,II,III,IV,VI |
Kentucky |
Site layout, Potable water supply and heating, sewers,
foundations, block framing, overhead doors, Electrical, fire hydrant, roof,
Fire Detection for a small warehouse / storage Building, |
2007 |
|
997 |
BOF Alloy Feed Conveying System - Engineering Study Design. Bin
sizing, equipment specifications and Request for Proposal |
ArcelorMittal |
I,II,III |
Indiana |
Site Utilities, Equipment Layout, Furnace chutes, structural
floor layout, electrical, controls, weigh belt feeders, alloy feed receipt |
2008 |
|
GAF-02 |
GAF Materials - Engineering Construction Management |
ArcelorMittal |
III,IV |
Indiana |
construction management services, installation and design
recommendations |
2007 |
|
1014 |
Fuel Loading Station - Engineering Services (Detailed Design |
ArcelorMittal |
I,II,III |
Indiana |
Demolition existing truck fueling station, fuel piping, new
loading ramp, new weather shelter, electrical, lighting |
2007 |
|
1023 |
PHA Analysis Sessions for Co-Generation Plant, |
ArcelorMittal |
I,II,VI |
Illinois |
Hazard Analysis, risk analysis, Energy usage review and
reduction, new Power Plant facility
design process and piping review, |
2007 |
|
1017 |
Engineering Services to provide ETRAINING for operators and
maintenance personnel at LMF Water Treatment Plant |
ArcelorMittal |
I,II,V,VI |
Indiana |
Cooling towers, pumps, chemical additives, LMF operations,
maintenance, backwash basins, Water Scrubbers, Cooling Water Systems, Water
Sprays |
2007 |
|
1016 |
BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System
upgrade including fan, VFD, piping and controls Study and Equipment
Recommendations |
ArcelorMittal |
I,II |
Indiana |
Hood Cooling water system monitoring, heat exchanger fans, Air
humidity and speed recording, BOF Furnace consumption |
2007 |
|
1015 |
Engineering Services for Natural Gas Mixing Station to supply in
the case of an emergency to Coke Oven Gas Main Pipe Line - Design and
installation |
ArcelorMittal |
I,II,III |
Indiana |
Mixing station building, ventilation, Natural Gas, Coke Oven
Gas, steam tracing relocation, condensate relocation |
2007 |
|
1013 |
Engineering Study and Equipment Recommendations for Pickle Line
Strip Surface Inspection System |
ArcelorMittal |
I,II,III |
Indiana |
Pickle Line existing utilities field and drawing surveys, piping
modifications, equipment modifications new equipment installation |
2006 |
|
1012 |
Engineering Study and Recommendation for Pickle Line Fume
Exhaust System Upgrade and Replacement - Environmental Controls |
ArcelorMittal |
I,II,III |
Indiana |
Pickle Line existing utilities field and drawing surveys, piping
modifications, equipment installation, demolition, Water supply and
recirculation systems |
2006 |
|
996 |
Air Compressor Upgrade Engineering Study, Design and
Installation |
ArcelorMittal |
III,IV,V,VI |
Indiana |
Site Utilities, Water , natural gas, sewers, foundation pad,
electrical, demolition, Air Reservoir tanks, piping, silencer |
2006 |
|
GAF-01 |
GAF piping and valve stations replacement and upgrade -
Engineering study and piping installation design |
ArcelorMittal |
I,II,III |
Indiana |
piping design, new pump installation, pipe supports, steam
piping, condensate piping, liquid asphalt piping |
2006 |
|
991-01 |
New Storage Building with multiple truck bays including a
washbay, site utilities, natural gas, electricity, water, sanitary and storm
sewers ( Design-Build) |
Veterans Affairs |
I,II,III,IV |
Illinois |
Surveying, geotechnical investigations,Site Utilities,
Water,natural gas, sewers, foundation, framing, brick exteriors,
insulated, Electrical, Lighting, HVAC,
roof, Fire Detection. Included potable hot water and cold water for a
warehouse / storage building. Water and waste water system design. |
2006 |
|
990-01 |
Electrical Upgrade, NEC Violations, 5 hospital buildings and
complex, 200,000 sq ft area |
Veterans Affairs |
I,II,III,IV |
Illinois |
Electrical conduit overfill, new panel, conduits, clearances,
tap violations |
2006 |
|
990-01-02 |
BOF Stack Replacement and Upgrade - Study design |
ArcelorMittal |
I,II |
Indiana |
Foundation and structural assessments, current gas flume
assessment, new stack reinforcement design, access platforms, ladders and
stairs, Gas flow measurements |
2006 |
|
989-01 |
BP Propylene Facility - Engineering Services |
ArcelorMittal |
I,II |
Indiana |
Tank - decompression and cleaning |
2006 |
|
992 |
BOP PHA Gas Cleaning Engineering Study |
ArcelorMittal |
I,II,VI |
Indiana |
Duct layout, Furnaces, Water sprays, Heat analysis, Safety
concerns, Maintenance recommendations |
2006 |
|
976 |
Gas Cleaning System review for damper operations and furnace
control for two-furnace operations for increased productivity |
ArcelorMittal |
I,II,VI |
Indiana |
Scrubber, Venturi, Waste Water Treatment,Electrical, HVAC, CO
Detection and Suppression, |
2006 |
|
966-2 |
Two(2) 39,000 cfm Fume Exhaust Systems for Process Line,
including scrubber & fan specifications, hood & ductwork designs -
Detailed Design |
ArcelorMittal |
I,II,III,IV,V |
Indiana |
Equipment Layout, Hood & Duct Design, Lifting Mechanism
& Building Designs, Electrical, HVAC, Fire Detection, Fire Suppression |
2005 |
|
963-01 |
Etraining System for Process Heater and Gas Cleaning Systems at
a Sinter Plant, modules |
ArcelorMittal |
I,V,VI |
Indiana |
Process Review, Site Walkdown, Module Development |
2005 |
|
960-04 |
2500 GPM Emergency Water System for an industrial plant,
including tie-in into existing water supply, pumping & recirculation
piping, pump controls & fuel oil tank conversion to water service -
Detailed Design |
ArcelorMittal |
I,II,III,IV,V |
Indiana |
Emergency Water supply assessment, design of emergency system
including, tank, piping |
2005 |
|
984-01 |
Cross Country Oil Line system, 4000 ft, steam heated |
ArcelorMittal |
I,II,III,IV |
Indiana |
Flexibility, loops, control system, multiple users |
2005 |
|
977-02A |
New Boilerhouse Desuperheated Water Generation, including reverse osmosis skids, 1st Pass
1000 gpm, 2nd pass 100 gpm, tank,
& transfer pumps, deaerator with controls & interconnecting piping -
Detailed Design |
ArcelorMittal |
I,II,III,IV,V |
Indiana |
Potable water supply, High purity water supply with a second
pass RO unit. Foundations, Space Utilization, Control Scheme, Piping
Installation, Electrical |
2005 |
|
976-02 |
Engineering Services for new electrically driven, 15 HP pumps
with platform & piping for a chemical loadout station - Detailed Design |
ArcelorMittal |
I,II,III,IV |
Illinois |
Structural Design, Pump Location, Light Oil Piping Design,
Electrical |
2005 |
|
975A |
Pre Carbon Facility - Fuel Change over - COG Distribution
Analysis, Suitability Review and Facility Definition for six(6) 60 MM BTU/HR
Coke Oven Gas Trains. |
ArcelorMittal |
I, II,VI |
Indiana |
Coke Oven Gas Piping, Tie-In Locations, Energy Savings
Evaluation, Electrical, HVAC, roof, Fire Detection, Fire Suppression |
2005 |
|
978 |
New Boilerhouse Utility Piping, Four(4) 150,000 lb/hr of Steam
at 900 psig including coke oven gas, natural gas, instrument air (IA),
nitrogen (N2), potable water & service water with supports & tie-in
locations - Detailed Design |
ArcelorMittal |
I,II,III |
Indiana |
Design of utilities including potable water system. |
2005 |
|
976 |
Commissioning Services for a Light Oil Loadout Station Upgrade,
including new operator panel, flowmeter & vapor recovery system |
ArcelorMittal |
IV,V |
Illinois |
Checklist Development, Operator Training, Troubleshooting,
Electrical, HVAC, Fire Detection, Fire Suppression |
2005 |
|
975 |
Engineering study that surveyed and identified savings in complex of
400,000 lb/hr of steam system with 10,000 ft of steam piping. |
ArcelorMittal |
I,II,VI |
Indiana |
Site Investigation, Survey Documentation, Report Development |
2005 |
|
966-1 |
Two (2) 39,000 cfm Fume Exhaust System for Electr Tinning Lines,
including scrubber & fan specifications, hood & ductwork designs -
Conceptual Design Study |
ArcelorMittal |
I,II,III |
Indiana |
Equipment Location Scenarios, Utility Tie-In Determination, Duct
Routing Selection, Electrical, HVAC, Fire Detection, Fire Suppression |
2004 |
|
965-1 & 965-2 |
Etraining system for Hot Strip Mill Operations & Maintenance |
ArcelorMittal |
V |
Indiana |
Module Development, Process Review, |
2004 |
|
960-02 |
Engineering Study and evaluation of a 100,000 gpm Plant Water
System, including taking and analyzing flow measurements |
ArcelorMittal |
I,II |
Indiana |
Plant Water System Walkdown, Flow Measurements, Piping
Replacement |
2004 |
|
959-2 |
New Air Compressor Facility for a Pickling Line, including 2 x
2000 cfm compressor station layout,
selection, control scheme development and piping layout - Detailed
Design |
ArcelorMittal |
III,IV |
Indiana |
Cooling water system design including strainers |
2004 |
|
959-1 |
Engineering Study for new air compressor facility at a Pickling
Line, including site walkdowns, drawing research and flow measurements |
ArcelorMittal |
I,II |
Indiana |
Compressor Selection, Equipment Location Scenarios, System
Evaluation |
2004 |
|
960 |
Engineering Study and evaluation of a 110,000 GPM Cooling Water
System, including system replacement scenarios & Emergency Pumping System |
ArcelorMittal |
I,II |
Indiana |
Emergency Water supply assessment, design of emergency system
including, tank, piping |
2004 |
|
QBOP-1 |
Training System update for a Q-Bop Propane System, OSHA required |
ArcelorMittal |
V |
Indiana |
Module Update |
2004 |
|
970-01 |
Process Safety Management & Training Services for a chemical
loadout station upgrade |
ArcelorMittal |
V |
Illinois |
Training Manual Development, PSM Plan Modification |
2004 |
|
956-2 |
Chemical Loadout Station Vapor Recovery Upgrade, including vapor
recovery, plc controls, utility piping & loadout platform - Detailed
Design |
ArcelorMittal |
III |
Illinois |
Valve Station Design, Pipe Routing, Structural Platform Design |
2004 |
|
972 |
Feasibility Study for a heating station roof conversion from an
open loop cooling system to a closed loop cooling, 100 MM BTU/hr system |
ArcelorMittal |
I,II |
Indiana |
Envelope Determination, Existing Utility Evaluation,
Calculations, Electrical, HVAC, roof, Fire Suppression |
2004 |
|
948 |
Computer Based Training for 2000 scfm Fume Exhaust System
Upgrade at a Chrome Plating Facility |
ArcelorMittal |
V |
Indiana |
Graphic Design, Module Development, Classroom Training |
2003 |
|
947 |
Galv Line Compressed Air Knife Study |
ArcelorMittal |
I,II |
Indiana |
Process Evaluation, Piping Modifications |
2003 |
|
956-1 |
Conceptual Study for a Chemical Loadout Station Vapor Recovery
Upgrade, including location selection, tie-ins for new utilities and Control
Panel Location |
ArcelorMittal |
I,II |
Illinois |
Location Options, Utiility Tie-Ins, Electrical |
2003 |
|
927A |
Oxygen System Upgrade for a Building Including new oxygen
control stations, piping, alarms & controls - Detailed Design |
Veterans Affairs |
I,II,III,IV |
Illinois |
Alarms, Power & Control Wiring, Oxygen Piping, Site
Preparation, Electrical, HVAC, Fire Detection |
2003 |
|
953 |
Engineering Study of Hood Cooling Water system for a two (2)
molten 285 Ton Furnaces |
ArcelorMittal |
I,II |
Indiana |
Data Gathering & Evaluation, Report Development |
2003 |
|
952 |
PSM Administration for a propane system at Q-BOP |
ArcelorMittal |
I,II,V |
Indiana |
Classroom Training Sessions, Audit Performance |
2003 |
|
950 |
Drawing Revisions for power generation facility |
ArcelorMittal |
III |
Illinois |
Electronic Document Management, CAD Work |
2003 |
|
946 |
Chrome Plating Facility 2000 cfm Fume Exhaust Upgrade,
including, ductwork design, plating solution evaporation system & storage
tank design - Detailed Design |
ArcelorMittal |
I,II,III |
Indiana |
Tank Design, Pipe Mat'l Selection, Equipment Selection, Platform
Design, HVAC, Electrical |
2003 |
|
945 |
Gas Cleaning Stack Performance improvement, review and
recommendations for the gas cleaning system |
ArcelorMittal |
I,II |
Pennsylvania |
Process Review, Report Development |
2003 |
|
927-1,2 |
Chrome Line Plating Solution Temperature Control for improvement
in yield and quality |
ArcelorMittal |
I,II,III |
Indiana |
Piping Design,Equipment Selection, Process Calculations |
2002 |
|
922-3 |
Computer Based Mechanical & Electrical Training Programs for
Air Compressor Facility Operation & Maintenance |
ArcelorMittal |
V |
Indiana |
Training Program Development |
2002 |
|
922-2 |
Compressor Facility, Including Compressors (2000 cfm x 4),
Dryer, Receivers (2 x 15,000 gal.), Piping Modifications & Control
Systems - Detailed Design |
ArcelorMittal |
III,IV |
Indiana |
Compressors, Dryers, Receivers, Location Selection, Piping,
Electrical, HVAC, Fire Suppression |
2002 |
|
944 |
As-Built Drawing Documentation for a power generation facility |
ArcelorMittal |
III |
Illinois |
CAD Work, Drawing Management |
2002 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|